Overview

Scope of work

  1. Survey Works, Dilapidation Survey, KTMB Track Alignment Engineering Survey
  2. Utilities Detection & Mapping
  3. ESCP, TMP, PQP etc
  4. Site Clearance & Demolition Work
  5. Remove & Reinstate Advertisement Signboard
  6. Beam Launching
  7. Bridge Bearing & Parapet
  8. Steel Rail Track (Main Rail & Guide Rail)
  9. Concrete Sleeper
  10. Ballasted Embankment Construction, Tamping & Profiling
  11. Track Sign, Gradient Post & Kilometer Post
  12. Overhead Catenary System
  13. Signalling & Communication System
  14. Fiberail
  • Status Completed
  • Completion Date November 2023
  • Location Selangor
  • Type Infrastructure Works
  • ClientProjek Lebuhraya Usahasama Berhad (PLUS)
  • DistrictSubang
  • Start DateJanuary 2023
  • Capacity27.5m long
  • LESB RolesMain Contractor (Design & Build)
  • ValueRM 18,908,213.40