Overview

Scope of work

  • Survey Works, Dilapidation Survey, KTMB Track Alignment Engineering Survey
  • Utilities Detection & Mapping
  • ESCP, TMP, PQP etc
  • Site Clearance & Demolition Work
  • Remove & Reinstate Advertisement Signboard
  • Beam Launching
  • Bridge Bearing & Parapet
  • Steel Rail Track (Main Rail & Guide Rail)
  • Concrete Sleeper
  • Ballasted Embankment Construction, Tamping & Profiling
  • Track Sign, Gradient Post & Kilometer Post
  • Overhead Catenary System
  • Signalling & Communication System
  • Fiberail
  • Status Completed
  • Completion Date November 2023
  • Location Selangor
  • Type Infrastructure Works
  • ClientProjek Lebuhraya Usahasama Berhad (PLUS)
  • DistrictSubang
  • Start DateJanuary 2023
  • Capacity27.5m long
  • LESB RolesMain Contractor (Design & Build)
  • ValueRM 18,908,213.40