Overview

Scope of work

  1. Stage 1: Excavation, Backfilling and Stockpile
  2. Stage 2: Excavate From On Site Stockpile and Backfilling
  3. Site Clearance and Preparation Works
  4. Removal of Earth Bund
  5. Preparation of Erosion Soil Control Plan (ESCP) including Implementation and Monitoring of Sediment Basin and Water Discharge
  6. Slope Protection of Stockpile Against Erosion
  7. Demolish Temporary Guard Wall, Earth Drain and Dispose Off Site
  8. Excavate Unsuitable Materials
  9. Spread, Level and Compact Imported Earth in Layers as Specified in Filling Areas
  10. Rock Excavation
  11. Temporary Ramp for Cofferdam
  • Status Completed
  • Completion Date September 2013
  • Location Kuala Lumpur
  • Type Earth Works
  • ClientBEWG (M) Sdn. Bhd.
  • DistrictPantai Dalam
  • Start DateDecember 2012
  • Capacity830,000 m³
  • LESB RolesMain Sub-Contractor
  • ValueRM 80,000,000.00