Overview

Scope of work

  1. Effluent Reuse = 2,000 m³/day
    • Ultrafiltration Process (UF)
    • Reverse Osmosis Process (RO)
    • Air Compressor
    • Chemical Dosing
    • Pipes & Fittings & Valves
    • M&E Building Services
    • Testing and Commissioning
    • Spare Parts
    • Training
    • Maintenance
  2. Wastewater Source Heat Pump = 1,200 kW
    • Sewage Source Chiller Unit
    • Special-purpose sewage heat interchanger
    • Condenser Water pump
    • Heat interchanger side circulating pump
    • Hydropneumatic Booster Pumping System
    • Softened water tank
    • Chilled Water Hydraulic Pressure Vessel
    • Water Decontamination Device
    • Auto Chemical Dosing System
    • Electrically controlled cabinet and control system
    • M&E Building Services
    • Testing and Commissioning
    • Spare Parts
  3. Rainwater Harvesting = 80 m³/day
    • Rainwater Filter Collector
    • Floating Suction Filter
    • Inlet Flow Dampener
    • Overflow Control Unit
    • Rain Aid Valve
    • Rainwater Transfer Pump
    • Rainwater Tap Signage
    • Piping System
    • PLC Control Panel
    • Testing and Commissioning
  4. Aquatic Skylight = 30 kW
    • Structural Steel Works
    • Glass Panel
    • External pump house
    • Pump house electrical works
    • Mechanical Works
    • Testing and Commissioning
  • Status Completed
  • Completion Date July 2017
  • Location Kuala Lumpur
  • Type Green Technologies
  • ClientBEWG (M) Sdn. Bhd.
  • DistrictPantai Dalam
  • Start DateJuly 2011
  • CapacitySolar Panel = 200kWh /Biogas = 700 kWh
  • LESB RolesMain Sub-Contractor
  • ValueRM 5,000,000.00