Overview

Scope of work

  • Filling Existing Raw Water Inlet Channel with Rocks and Excavated Suitable Material
  • Rock Revetment near Existing Intake Channel
  • Supply & Install Sheet Piles Including Painting to close up gap at existing sheet piling
  • Protection from erosion by filling sinkhole
  • Erosion control with rock and levelling with rock filled gabion mattress
  • Status Completed
  • Completion Date August 2020
  • Location Terengganu
  • Type River Engineering
  • ClientBEWG (M) Sdn. Bhd.
  • DistrictKemaman
  • Start DateDecember 2015
  • LESB RolesMain Sub-Contractor
  • ValueRM 2,170,000.00

Gallery

Enquiry

Wish to get a call back from our team? Fill in your details.