Overview

Scope of work

  1. Filling Existing Raw Water Inlet Channel with Rocks and Excavated Suitable Material
  2. Rock Revetment near Existing Intake Channel
  3. Supply & Install Sheet Piles Including Painting to close up gap at existing sheet piling
  4. Protection from erosion by filling sinkhole
  5. Erosion control with rock and levelling with rock filled gabion mattress
  • Status Completed
  • Completion Date August 2020
  • Location Terengganu
  • Type River Engineering
  • ClientBEWG (M) Sdn. Bhd.
  • DistrictKemaman
  • Start DateDecember 2015
  • LESB RolesMain Sub-Contractor
  • ValueRM 2,170,000.00

Gallery

Enquiry

Wish to get a call back from our team? Fill in your details.