Overview
Scope of work
- Filling Existing Raw Water Inlet Channel with Rocks and Excavated Suitable Material
- Rock Revetment near Existing Intake Channel
- Supply & Install Sheet Piles Including Painting to close up gap at existing sheet piling
- Protection from erosion by filling sinkhole
- Erosion control with rock and levelling with rock filled gabion mattress
- Status Completed
- Completion Date August 2020
- Location Terengganu
- Type River Engineering
- ClientBEWG (M) Sdn. Bhd.
- DistrictKemaman
- Start DateDecember 2015
- LESB RolesMain Sub-Contractor
- ValueRM 2,170,000.00