Overview

Scope of work

  • Four (4) Nos of Tidal Control Gates (Pa' Maong, Sg. Bakau, Sg. Bakap & Sg. Badak Mati):
  • Four (4) Nos. of Pump House (Bukit Tambun, Bagan Buaya, Kg. Changkat & Kg. Jawi):
  • River improvement and River deepening (5g. Jawi & Sg. Duri):
  • Drain improvement (Taman Serindit & Kg. Jawi);
  • Flood bund (Sg. Jawi);
  • Four (4) Nos of Flood Detention Ponds (Jawi, Baong, Rambai & Duri);
  • Slope stabilization (Sg. Jawi).
  • Status On-Going
  • Completion Date 7th February 2028
  • Location Pulau Pinang
  • Type River Engineering
  • ClientJabatan Pengairan S Saliran Malaysia
  • DistrictSeberang Perai
  • Start Date8th February 2024
  • CapacityVarious
  • LESB RolesMain Contractor (Design & Build)
  • ValueRM 90,450,454.00