Overview

Scope of Work
- Mechanical Works
- Treated Water Pumping System
- Flowmeter
- Plunger, Altitude, Butterfly Valve
- Surge Protection System Drainage Pumping System
- Overhead Crane
- Re-chlorination System
- Electrical Works
- Main Switchboard
- Cabling Works
- Small Power & Lighting Works
- LV Sub Control & Cabling Works
- Waterproof Local Control Panel (LCP)
- Level Sensor
- Control & Telemetry Works
- Lightning Protection & Earthing System
- Status Completed
- Completion Date August 2021
- Location Terengganu
- Type Mechanical & Electrical
- ClientBEWG (M) Sdn. Bhd.
- DistrictKemaman
- Start DateDecember 2015
- Capacity10 MLD
- LESB RolesMain Sub-Contractor
- ValueRM 6,600,000.00