Overview

Scope of work

  1. Mechanical Equipment for Water Treatment Plant and Raw Water Treatment
    • Complete Treated Water Pumping System (1,500 m³/hr)
    • Drainage Pumping System
    • Electrical Overhead Travelling Crane
    • Backwash Pumping System (220 m³/hr @ 10.4m)
    • Sludge Pumping System
    • Supernatant Pumping System
    • Surge Protection System
    • Chemical Pumping System
    • Flowmeter, Gauge & Level Meter
    • Valves
    • Fire Protection System
  2. Electrical Equipment for Water Treatment Plant
    • MCC Room
    • Cabling Work
    • Small Power & Lighting Work
    • LV Cabling Works
    • Rectification and Servicing Works
    • Compound & Street Lighting
    • Earthing & Lightning Protection System
  • Status Completed
  • Completion Date August 2021
  • Location Terengganu
  • Type Mechanical & Electrical
  • ClientBEWG (M) Sdn. Bhd.
  • DistrictKemaman
  • Start DateDecember 2015
  • Capacity255 MLD
  • LESB RolesMain Sub-Contractor
  • ValueRM 42,500,000.00