Overview

Scope of work

  1. Mechanical Works
    • Flowmeter
    • Valves
    • Mechanical Automatic Roller Shutter
    • Roof Turbine Ventilator & Exhaust Fan
    • Overhead Travelling Crane
    • Ventilation & Air Conditioning
    • Fire Protection Works
    • Complete Booster Pumping System 1 (1,771 m³/hr @ 45m)
    • Complete Booster Pumping System 2 (1,042 m³/hr @ 73m)
  2. Electrical Works
    • Panel and Transformer
    • Switchboard Panel
    • Cabling & Termination Works
    • Small Power & Lighting
    • Compound Lighting
    • Lightning Protection & Earthing System
  • Status Completed
  • Completion Date August 2021
  • Location Terengganu
  • Type Mechanical & Electrical
  • ClientBEWG (M) Sdn. Bhd.
  • DistrictKemaman
  • Start DateDecember 2015
  • Capacity110 MLD
  • LESB RolesMain Sub-Contractor
  • ValueRM 24,300,000.00