Supply and Install of Pipeline including washout valve, air valve and Butterfly Valve for:

  1. (A1-A2) DN1200 Pipeline From Binjai To Bukit Kolam Reservoir (6.7 KM)
  2. (A2-A3) DN800 Pipeline From Bukit Kolam Reservoir To Geliga (9.0 KM)
  3. (A2-A4) DN800, DN450, DN300 Pipeline From Bukit Kolam Reservoir To Exisiting Taman Banggol Indah Elevated Reservoir And Existing Taman Putera Elevated Reservoir (8.9 KM)
  4. (A3) DN1200 Pipeline From Exsiting Bukit Sah Water Treatment Plant To New Bukit Sah 3 Balancing Reservoir (1.1 KM)
  5. (A3) DN1700, DN1500 & DN1300 Raw Water Pipeline From New Water Intake (1.0 KM)
  6. (A3) DN450 Pipeline From Air Jernih Pump Station To Existing Seri Bandi Reservoir (13.3KM)
  7. (E1-A1) DN1500 Pipeline From Bukit Sah 3 Balacing Reservoir To Binjai (3.9 KM)
  8. (C1) DN1100 Pipeline from Petronas Water Treatment Plant to New Labohan Booster Station (8.7 KM)
  9. (C1) DN900 Twin Pipeline from Labohan Booster Station to Bukit Labohan Reservoir (4.7 KM)
  10. (C2) DN500 Pipeline From Simpang Kg Wa Existing Pipeline To Clear Water Tank Of Jerangau Water Treatment Plant (8.9KM)
  • Status Completed
  • Completion Date January 2021
  • Location Terengganu
  • Type Pipe Works
  • ClientBEWG (M) Sdn. Bhd.
  • DistrictKemaman
  • Start DateDecember 2015
  • Capacity63.0KM (Total)
  • LESB RolesMain Sub-Contractor
  • ValueRM 250,100,000.00