Overview

Scope of work

Supply and Install of Pipeline including washout valve, air valve and Butterfly Valve for:

  • (A1-A2) DN1200 Pipeline From Binjai To Bukit Kolam Reservoir (6.7 KM)
  • (A2-A3) DN800 Pipeline From Bukit Kolam Reservoir To Geliga (9.0 KM)
  • (A2-A4) DN800, DN450, DN300 Pipeline From Bukit Kolam Reservoir To Exisiting Taman Banggol Indah Elevated Reservoir And Existing Taman Putera Elevated Reservoir (8.9 KM)
  • (A3) DN1200 Pipeline From Exsiting Bukit Sah Water Treatment Plant To New Bukit Sah 3 Balancing Reservoir (1.1 KM)
  • (A3) DN1700, DN1500 & DN1300 Raw Water Pipeline From New Water Intake (1.0 KM)
  • (A3) DN450 Pipeline From Air Jernih Pump Station To Existing Seri Bandi Reservoir (13.3KM)
  • (E1-A1) DN1500 Pipeline From Bukit Sah 3 Balacing Reservoir To Binjai (3.9 KM)
  • (C1) DN1100 Pipeline from Petronas Water Treatment Plant to New Labohan Booster Station (8.7 KM)
  • (C1) DN900 Twin Pipeline from Labohan Booster Station to Bukit Labohan Reservoir (4.7 KM)
  • (C2) DN500 Pipeline From Simpang Kg Wa Existing Pipeline To Clear Water Tank Of Jerangau Water Treatment Plant (8.9KM)
  • Status Completed
  • Completion Date January 2021
  • Location Terengganu
  • Type Pipe Works
  • ClientBEWG (M) Sdn. Bhd.
  • DistrictKemaman
  • Start DateDecember 2015
  • Capacity63.0KM (Total)
  • LESB RolesMain Sub-Contractor
  • ValueRM 250,100,000.00