Projects

HomepageProjects

Upgrading of Sewage Treatment Plant and Sewerage Pipe Network for Lahad Datu Sewerage Scheme Phase 2

Sabah
  • On-Going

  • 1st August 2027

  • Wastewater Treatment

Construction of Sewage Treatment Plant and Sewerage Conveyance System in Papan, Kinta District, Perak – Package 2 STP Design & Build

Perak
  • Completed

  • 30 August 2023 (Treatment Plant) & 3 April 2024 (Additional Works)

  • Wastewater Treatment

Construction of Pantai 2 Sewage Treatment Plant, Federal Territory of Kuala Lumpur (Design & Build)

Kuala Lumpur
  • Completed

  • July 2017 (Including 2-year Operation & Maintenance)

  • Wastewater Treatment

Sewerage Treatment Plant Project Phase 2 Package 2 – Sg Nyior, Seberang Perai, Pulau Pinang

Pulau Pinang
  • Completed

  • 2008

  • Wastewater Treatment

Package B11 – Proposed Design, Build And Commissioning For The Upgrading Works of a Biosoil Sewage Treatment Plant At Taman Pandan Perdana (AMA 119), Ampang JAYA, Selangor

Selangor
  • Completed

  • 2008

  • Wastewater Treatment

Package K01 – Proposed Design, Fabrication, Supply, and Installation Work of Thirteen (13) Units of FRP Sewage Treatment Plant Tank System and Associated Works in Penang (3 Units), Perak (3 Units), Selangor (3 Units), Negeri Sembilan (1 Unit), and Melaka (3 Units).

Pulau Pinang
  • Completed

  • 2008

  • Wastewater Treatment

Supply And Installation Of Equipment For The Construction Of The Sewage Treatment Plant Project (Phase 1: Package 1 For Sewerage Services Department, Ministry Of Energy, Water And Communications)

Kuala Lumpur
  • Completed

  • 2007

  • Wastewater Treatment

Package B5 – Proposed Design & Build to Upgrade Two (2) Units of BioSoil Sewage Treatment Plant at Taman Shamelin Perkasa (KLR211), Cheras, Kuala Lumpur, and Taman Sri Bahagia BioSoil Plant (HLT104), Cheras, Selangor.

Kuala Lumpur
  • Completed

  • 2004

  • Wastewater Treatment

Construction, Installation, Completion, Testing and Commissioning of Solar and Biogas Power System at Pantai 2 STP, Kuala Lumpur

Kuala Lumpur
  • Completed

  • July 2015

  • Renewable energy

Posts pagination

Page 1 Page 2 … Page 5 Next page

Contact Us

phone

+(60)3-2242 2882

Level 29-02, Tower B, The Vertical Business Suite,
No. 8, Jalan Kerinchi, Bangsar South,
59200 Kuala Lumpur

email

info@loyalgroup.com.my

about us

Loyal Engineering Sdn. Bhd. (formerly known as Loyal Wastewater Engineering Sdn. Bhd.) was founded in 1991. We are a Malaysia based business group with diversified operations and experiences.

Quick Links

  • About Us
  • Capabilities
  • Portfolio
  • Careers
  • Contact Us
  • Whistleblowing Policy

Follow us

Linkedin-in

© 2025 – Loyal Engineering Sdn. Bhd.
All Rights Reserved.

  • About Us
  • Careers
  • Contact
  • Contact
  • Engineering, Procurement, Construction & Commissioning (EPCC)
  • Loyal Engineering SDN BHD
  • Nereda
  • Operation & Maintenance (O&M)
  • Project Management
  • Projects
  • Water & Wastewater Treatment
  • Whistleblowing Policy